Federal Railroad Administration, DOT. § 213.4
railroad track at a standard that exceeds FRA Class 2 safety standards and adhere to
for inspection or copying by the Federal Railroad Administration during regular
§213.235 Inspection of Switches, Track Crossings, and Lift Rail Assemblies or Other
{besps_c}0|2turnouts.jpg| Gauge for inspection of switch rail damage (U.K.).
concrete plank (for 141-lb. rail) placed on 10-ft. switch ties.
In some cases, federal and/or state regulations govern
(b) The track owner shall file its CWR plan with the FRA Associate
The Federal Railroad Administration's (FRA) Track Safety Standards are the
To identify the track, the observer looks for the gap between the switch points and.