@tonystar. I added a "has-float-label" class to each form-filed by changing the form-billing.php and form-shipping.php loop:
Please note, that this text changes dynamically depending on a payment method selected: How to change the text on the Place Order button in WooCommerce ...
_x('Notes about your order, e.g. special notes for delivery.
I need to change the text (label) "Product" to "Ticket" in WooCommerce Order Item table email notifications. How would I do this? Is it possible?
I've also got this code from order-details. php.
Changing the text on the “Place Order” button; Removing a field; Making a field required (or not required); Changing input field labels and ...
[This thread is closed.] Hi, Is there a way to change the text in the Order Notes section> This is the area which reads : 'Notes about your…
Barcode object. You can assign WooCommerce data to each label object from Step 2: Change label settings.
[This thread is closed.] Been trying to find how I can the “PLACE ORDER” text in the button on the checkout form, anyone any ideas how I…
The order meta keys can be found in the custom field section in the WooCommerce Order page of a product. Enable print shipping label option for order status: ...